Back to search

Set Builder

Echoes in Concrete
Southwark Playhouse (Little), Southwark3 to 15 Nov 12 performances about 70 hours
£850
Workshop experience needed
2 build weeks plus install

The production

Three generations of a family argue about a tower block that is about to come down, over one afternoon on the walkway outside flat 42.

A single concrete set, heavy sound design and a projection element mapped onto the set walls.

Four weeks in Southwark, weekday daytimes.

What you will actually be doing

  • Build flats and a raised walkway to drawings
  • Work with the scenic artist on the concrete finish
  • Install and make good at the venue

Required

  • Confident with power tools
  • Able to read construction drawings

Useful, not essential

  • Scenic finishing experience
  • Own hand tools

The commitment

  1. Build weeks

    19 to 30 Oct

    Workshop in Deptford

  2. Install

    31 Oct

Compensation, in full

Weekly build rate
£350 per week
Install day
£150
Travel
Reimbursed in full
Estimated commitment
70 hours

Travel reimbursed in full.

Venue technical information

Southwark Playhouse (Little) · 70 seats · Southwark

Lighting desk
ETC Ion Xe
Sound desk
Yamaha TF1
Speakers
4x Nexo with sub
Microphones
8x Shure radio packs
Projector
Available on request
Rig
Overhead grid with full access via tallescope
Technical contact
Production team, Monday to Friday