Back to search

Production Electrician

Echoes in Concrete
Southwark Playhouse (Little), Southwark3 to 15 Nov 12 performances about 100 hours
£1,400
Professional experience required
Prep, production week and run maintenance

The production

Three generations of a family argue about a tower block that is about to come down, over one afternoon on the walkway outside flat 42.

A single concrete set, heavy sound design and a projection element mapped onto the set walls.

Four weeks in Southwark, weekday daytimes.

What you will actually be doing

  • Prep and test the rig before fit-up
  • Lead the rig and focus sessions
  • Maintain the rig across a twelve show run

Required

  • Working at height competence
  • Previous production electrician credits

Useful, not essential

  • ETC Ion experience
  • IPAF or similar

The commitment

  1. Prep

    28 to 30 Oct

  2. Fit-up & focus

    31 Oct to 1 Nov

  3. Run maintenance

    3 to 15 Nov

    Weekly checks

Compensation, in full

Prep and fit-up
£1,000
Run maintenance
£400
Travel
Reimbursed in full
Estimated commitment
100 hours

Travel reimbursed in full.

Venue technical information

Southwark Playhouse (Little) · 70 seats · Southwark

Lighting desk
ETC Ion Xe
Sound desk
Yamaha TF1
Speakers
4x Nexo with sub
Microphones
8x Shure radio packs
Projector
Available on request
Rig
Overhead grid with full access via tallescope
Technical contact
Production team, Monday to Friday